The Guinean government has had a budget of approximately 45 million euros for the new construction of the Mama Bang hospital in the most populous city in the territory, Bata.
The hospital has had the INCO 70.4 Composite Slab system in a thickness of 1.00 mm for slabs of 5,000 m2 in addition to the perimeter finials to prevent concrete casting during the execution phase. The composite slab floor system allows great versatility in different plant solutions, in addition to lightening the weight of the floor and therefore reducing the volume of concrete in the slab.
































